The concrete has been poured in most of the major parking areas.
The foundation on the east side of the library is in progress.
The framework of the retaining walls is in progress.
Posted in Uncategorized | Leave a Comment »
Things are progressing well!
Posted in Uncategorized | Leave a Comment »
The inspections have gone well and the building permit has been issued to commence with the next phase of construction! All storm water detention structures are in place and functioning, and the site has been connected to the water main. The main driveway is being prepared for asphalt, and curbs around the parking areas are being laid out.
This slideshow requires JavaScript.
Posted in Uncategorized | Leave a Comment »
Grading of the building slab is complete, as is backfill of the stormwater detention area. The new curb is in the process of being set for parking along West Street.
Posted in Uncategorized | Leave a Comment »
Thanks to Georgia Library Quarterly and Sarah King Steiner for the nice article!
It’s in the ‘Construction Updates’ section, Volume 49 (2012), Issue 1, Article 7, Page 2.
Posted in Uncategorized | Leave a Comment »
Work continues to move steadily along. The rainwater runoff system is largely in place, grading is ongoing, and a portion of North Avenue has been re-paved.
This slideshow requires JavaScript.
Posted in Uncategorized | Leave a Comment »